Key point
Check phase-by-phase loads and outage output limits, not only the combined rating. Use a circuit schedule to confirm imbalance capability and support for three-phase appliances.
Product ranges to review for this topic: Deye Hybrid Inverter · Growatt Residential Hybrid Inverter
Related product references: DEYE SUN-12K-SG05LP3-EU-SM2 — Hybrid inverter · GROWATT SPH 10000TL3 BH-UP — Hybrid inverter
Put the loads on a circuit schedule
Whole-home backup is an easy phrase to write in an enquiry, but the design needs individual circuits. Have an electrical professional identify major single-phase loads, three-phase equipment and the circuits included in backup. The combined rating does not establish headroom for a large load on one phase. Do not assume unused capability on another phase is freely available in every operating mode.
Separate grid-connected and outage behaviour
A net total on the utility meter is not a statement of per-phase output during an outage. Ask the designer for per-phase limits, supported imbalance and starting conditions in both grid-connected and islanded operation. Provide complete models for heat pumps, three-phase pumps and large charging loads. The words three-phase inverter are not a substitute for these checks.
Review an ordinary evening
Describe combinations such as cooking, cooling and hot water at the same time. Agree which equipment must be staggered during backup. Keep the circuit schedule, test results and user instructions at handover. Electrical professionals should make circuit changes; users should not alter protection to make an appliance run. A proposal that explains its limits is easier to live with than an undefined promise to power everything.
Further reading: www.victronenergy.com
This article supports early project discussions. Final configuration depends on site conditions.