Key point
Reassess shade using equipment position, height, seasonal conditions and array layout. A noon photograph or shaded roof area alone cannot establish the loss; retain drawings and change dates.
Product ranges to review for this topic: Solis Three-Phase String Inverter · GCL High-Efficiency PV Module
Related product references: Solis S6-GC110K — String inverter · GCL NR10R/54GDF 505W — PV module
A noon photograph is not a full assessment
Roof contractors need to know whether new equipment fits; solar designers also need its height, position and shadows at relevant times. No shade at noon does not establish the same result in other hours or seasons. Provide the revised roof plan, dimensions and array layout for an appropriate assessment rather than using one photograph to predict a year's effect.
Identify the affected modules
Ask the review to locate affected modules, their string connections and the periods of generation involved. Designs respond differently to partial shade. Roof area shaded is not a reliable proportional estimate of generation lost, and an extra device is not an automatic cure. Relevant professionals should also preserve maintenance access and the space required for fire and roof services.
Keep the change in the site records
Update the roof drawing and retain the construction date and shade assessment. Annotate monitoring records so later investigations can compare changes in performance with the work. Any array movement or electrical redesign needs professional review and applicable approvals; the roof contractor should not move modules independently. Coordination before installation is easier than resolving responsibility after the new equipment is in place.
Further reading: www.energy.gov
This article supports early project discussions. Final configuration depends on site conditions.