Key point
Treat a module substitution as a design change, not just a wattage comparison. Obtain a model-specific review of cold-condition string voltage, operating range, current and the final string layout before ordering or connecting equipment.
Product ranges to review for this topic: Solis Three-Phase String Inverter · GCL High-Efficiency PV Module
Related product references: Solis S6-GC110K — String inverter · GCL NR10R/54GDF 505W — PV module
The wattage is only one line on the datasheet
A purchasing comparison often starts with watts and price. For a module substitution, ask the designer to review open-circuit voltage, its temperature coefficient, current and the proposed string arrangement as well. The inverter model and input limits belong in the same review. A similar power rating does not establish electrical compatibility.
Ask for the cold-weather check in writing
PV string voltage must remain within the selected inverter’s limits under the relevant site conditions. Have the designer document the cold-temperature assumption and check operating voltage and current separately. A string can need review even if it has worked during warm weather. Do not use another installation’s module count as approval for yours.
Close the substitution before equipment ships
Keep the approved module model, inverter model, string layout and dated design revision together with the order. If any of those change, return the substitution to the designer. Installation and electrical checks belong with qualified personnel; this is not a reason to open connectors or measure live DC yourself. An agreed drawing is cheaper to correct than equipment already on the roof.
Further reading: manuals.sma.de · www.sma.de
This article supports early project discussions. Final configuration depends on site conditions.