Shared business parks: whose electricity does solar and storage offset?

Savings at the main meter do not automatically divide neatly between tenants. Define metering before installation.

Key point

In a shared business park, define which meters see solar generation, battery charging and tenant loads before allocating savings. Monitoring data is not automatically a settlement basis; agree measurement points, timing, data access and responsibilities.

Draw the energy paths

Put the main supply, tenant meters, common loads, PV and battery on one diagram. Identify which meters see generation, charging and discharge. Connection location changes the data; generation displayed on one platform cannot establish each party’s consumption change.

Separate operation from settlement

Device data is useful for monitoring, but should not become a billing basis without validation. Agree measurement points, clock synchronisation, access and missing-data handling. Relevant parties must confirm contracts and applicable local requirements for allocation or electricity supply.

Plan for occupancy changes

Tenant departures, vacancies and shift changes can alter demand. Retain load records and specify who can change controls and review results. A metering diagram and responsibility list prevent avoidable arguments later.

Further reading: www.energy.gov

This article supports early project discussions. Final configuration depends on site conditions.