Key point
When export is prohibited and the battery is full, compatible controls may need to reduce solar output as site demand falls. Verify metering, coordination and failure behaviour at the agreed connection point; a larger battery alone does not guarantee zero export.
Product ranges to review for this topic: Hithium Commercial & Industrial Storage · Deye Hybrid Inverter
Related product references: Hithium ESS Cabinet 125kW / 261kWh — Energy storage system · DEYE SUN-12K-SG05LP3-EU-SM2 — Hybrid inverter
Define the control boundary
Export limits concern power at the agreed site connection point, not simply one inverter’s output. Meter location, load circuits and coordination between devices matter. Request a diagram showing PV, storage, loads and measurement, with responsibilities for normal and abnormal operation.
Plan for surplus after charging stops
With low demand, high solar output and a full battery, compatible controls may need to curtail PV. A larger battery does not automatically eliminate curtailment. Check weekends, holidays and production shutdowns as well as ordinary working days.
Include failures in acceptance
Specify the response to lost metering communications, sudden load removal and a battery unable to charge. Control capabilities and connection requirements vary. Qualified personnel should test against the agreed local requirements. A dashboard showing zero export at one instant is not a complete control test.
Further reading: manuals.sma.de
This article supports early project discussions. Final configuration depends on site conditions.